Sheffield-based decorators · Established 2010Call 0330 666 55 11
RAVEN DÉCOR · FLAGSHIP COMMERCIAL PROJECT

Mondelēz International Exterior transformation.

A striking commercial exterior refurbishment, bringing together large-scale cladding spray coatings, specialist asbestos encapsulation, timber and board repairs, and detailed finishing to fences, turnstiles and safety barriers.

COMMERCIAL & INDUSTRIALMULTI-TRADE EXTERIOR WORKSPHOTOGRAPHED FROM START TO FINISH
The story behind the finish

A familiar building. A remarkable transformation.

For this substantial project at Mondelēz International, the challenge extended well beyond changing the colour of the exterior cladding. The scope involved preparing and improving multiple elements of a busy commercial site, coordinating different trades and achieving a coherent finish across large industrial elevations and smaller architectural details.

The building's distinctive purple appearance is the most immediately visible result. Behind it was a broader programme of specialist enabling works, repairs and finishing, including areas dealt with by our asbestos encapsulation team before the decorating operations proceeded.

The photographic archive spans earlier conditions, work in progress and finished surfaces, helping tell the story of the building's transformation rather than showing only the final coat of paint.

Before and after

From tired exteriors to a bold new identity.

The project archive records ageing cladding and exposed details before the work, followed by the powerful purple finish visible across the building today.

Earlier condition of blue-grey industrial cladding and entrance at Mondelēz International
Before · Existing cladding and building elevations
Purple exterior cladding and frontage after spray coating at Mondelēz International
After · Bold purple cladding throughout the frontage
Full scope of works

Much more than cladding spraying.

Our role encompassed the prominent exterior surfaces and a series of associated repairs and smaller coating works that helped deliver a consistent appearance across the site.

01 / SPECIALIST ENABLING WORKS

Asbestos encapsulation

Our specialist asbestos team encapsulated designated areas before the subsequent external decorating and coating stages. The precise treatment system and compliance records are not published in this case study.

02 / MAIN EXTERIOR FINISH

Commercial cladding spray coatings

Large sections of profiled industrial cladding received the recognisable purple finish. The archive shows varying stages of coverage, elevated working positions and the completed elevations.

03 / FABRIC REPAIRS

Timber doors and window sills

Repairs to deteriorated timber around external door frames and window sills formed part of the wider exterior programme, addressing damaged details before final decoration.

04 / EXTERIOR BOARDING

Replacement external boards

Selected exterior boards were replaced on the reception and car-park side of the building, improving the surfaces and details incorporated into the refurbishment.

05 / PERIMETER FINISHES

Fences and turnstiles

Metal perimeter fencing and pedestrian turnstile areas were also painted, extending the improvement beyond the principal building envelope and into its entrances and boundary features.

06 / SITE DETAILS

Yellow safety barriers

Selected safety barriers and external protective metalwork were painted yellow, bringing clear visual definition to key loading and circulation areas.

Completed purple corrugated cladding and bright yellow safety barriers
Finished exterior · A consistent colour across the cladding
01 / The main transformation

Industrial cladding, reimagined.

The dominant part of the visual transformation was the exterior cladding. Covering large profiled elevations and the varied geometry around service areas required the work to be approached as a commercial coating programme, rather than a routine wall-painting job.

Photographs in the archive capture the earlier blue and grey finish, intermediate areas where the application was progressing, and the final purple appearance around the building and prominent Mondelēz signage.

High-level access equipment appears throughout the archive. That reflects the practical considerations around working on long elevations, roofline junctions, canopies and busy external routes.

Learn about our commercial spray coatings ↗
02 / The details matter

Repairs beneath the surface.

The project wasn't simply a visual recolouring exercise. The scope also covered necessary repairs to external door frames and window sills where existing timber had deteriorated, as well as replacement boarding on the reception/car-park elevation.

The earlier photographs show weathered and damaged frames, openings and edge details. These less obvious tasks mattered because the finished exterior needed to look considered across the whole property, not only on the largest cladding panels.

Our specialist asbestos encapsulation team also completed designated treatment areas before later coating works. Asbestos-related work requires the correct assessment, method and competent personnel; this gallery is a visual project record, not an asbestos method statement or certification record.

Corrosion and deterioration at an external window frame before the repair programme
Earlier condition · External window detail
Timber repairs to external sill at the Mondelēz premises
Repair stage · Renewed timber at the window sill
Existing blue metal perimeter fencing and pedestrian access
Perimeter areas · Existing fencing and turnstiles
Purple finished fencing at the Mondelēz perimeter
Later finish · Purple perimeter fencing
03 / Beyond the building

A coordinated finish across the grounds.

The external programme extended into surrounding areas. Fencing and turnstiles were painted, helping the site entrances and perimeter sit comfortably with the newly coated main buildings.

Selected yellow barriers were also repainted around the loading areas, entrances and circulation routes. Their bright colour contrasts with the purple cladding and makes these protective features a visible part of the final exterior.

This broader scope is what makes Mondelēz such a strong example of coordinated commercial refurbishment: one project bringing together several related types of external work, each with its own preparation and finishing requirements.

On-site footage

See the work in motion.

Short original clips from the project archive give a further view of the building and site as the external programme progressed. Videos are not played automatically.

Exterior cladding and coated elevations
An on-site view during the work
Wider view of the purple-clad building
The finished result

A standout exterior with depth behind it.

The purple cladding delivers the headline visual impact, but the project also demonstrates the value of combining specialist enabling works, fabric repairs and precise external painting in one coordinated programme.

For building owners, facilities teams and main contractors, it showcases the breadth of exterior decorating and refurbishment work that can sit alongside a large commercial coatings contract.

Mondelēz International signage on purple completed exterior
Mondelēz International · Exterior refurbishment
A fresh start for your space

Let's make your next project
something special.

Tell us what you have in mind. We'll help you take the next step.